Extensions

Extensions designed to feel like they were always there.

Single and two-storey, side-return, wraparound and front extensions across Hertfordshire, Buckinghamshire and West London — designed, engineered and built by one team.

Free and without obligation. We reply within one working day.

Single-storey brick rear extension with full-width glazed doors, a stone patio and steps to the lawn
Rear extension — Hemel Hempstead

Types of extension

Which extension is right for your home?

Every house is different — at the site visit we'll tell you honestly which option gives you the most space and value for your budget.

Planning at a glance

Do you need planning permission?

Many single-storey rear extensions can be built under permitted development — without a full planning application — as long as they stay within set limits. Side, two-storey and wraparound extensions more often need planning permission, and different rules apply in conservation areas and the Chilterns National Landscape.

ExtensionOften permitted development?Typical route
Single-storey rearOften — within size limitsPermitted development, prior approval or Lawful Development Certificate
SideSometimes — single storey, up to half the house's widthVaries; not permitted development in conservation areas
Two-storeyRarelyPlanning permission
WraparoundRarelyPlanning permission
PorchOften — up to 3 m² floor areaPermitted development
Read our planning guide

Real project

Built by AMH in Hemel Hempstead.

Read the case study
Before: an overgrown sloping rear garden with sleeper steps and a shedBefore
After: a porcelain terrace, rendered retaining walls and steps up to a level lawnAfter
Rear garden — terrace, retaining walls & steps
Before: a brick semi with a small canopy porch and an overgrown front gardenBefore
After: a new brick front extension, gravel garden and new stepsAfter
Front — porch extension, walls & garden

FAQs

Questions we're often asked

How long does an extension take to build?

A typical single-storey rear extension takes around 12–16 weeks on site, after design and approvals. We agree a written programme before work starts.

Can we live at home during the build?

Usually, yes. We plan the build so the house stays watertight and secure, keep dust and noise to working hours, and phase the knock-through to the existing house as late as possible.

Do I need building regulations approval?

Yes — virtually every extension needs building regulations approval, even when it doesn't need planning permission. We handle the application and the inspections.

How much does an extension cost?

It depends on size, structure, glazing, finishes and access. We don't publish price lists because every home is different — see how we price your project.

Start your project

Planning an extension?

A free, no-obligation site visit — an honest view on feasibility, budget and timing before anything is drawn.

Call Arrange a site visit